Coverto signs a collective agreement with Byggnads

Coverto signs hanging agreement (in swe: Hängavtal) with Byggnads. We are long-term and want to work for a healthy and fair construction industry.

With a collective agreement at the workplace, both employers and employees know which rules apply. The employees are guaranteed reasonable wages and conditions that are common to the industry. In this way, we and the companies can compete on equal terms without the risk of someone trying to improve profitability through poor employment conditions.

Kollektivavtalskollen: https://www.byggnads.se/medlem/kollektivavtal/kollektivavtalskollen/

Coverto is awarded Industry Winner 2022

We at Coverto are extremely proud of the award Branschvinnare 2022 (Industry Winner 2022 award). It is proof that our offer is right on time and was still in demand during a pandemic.
Despite a tough pandemic, we managed to increase our turnover tenfold. But we would never have succeeded in this without our competent and dedicated staff, our partners and our suppliers.
So thanks to everyone!
Now we aim for new goals!

Unique entrance portal developed for Snabbgross project

The main customer required that the entrance portal above the entrance should have:

  • a smooth surface
  • long span width of 10 m
  • hidden fastening
  • invisible vertical joints/fittings
  • a special colour
  • panels that would be aligned with the existing facade

We solved this with a cost-effective special solution together with our suppliers.

The solution is unique and something we take with us as an offer in other projects.

Wastewater treatment plant in Tibro

Coverto has been assigned to deliver and install decking profiles (TRP), concrete plinths, steel stairs and sandwich panels with accessories. The work will start on February 21, 2022.

• Client: Asplunds Bygg
• Location: Tibro
• Size: – m2
• Start: 2021-02-21

Snabbgross in Skövde

Coverto has been assigned to design, deliver and install steel frames, roofing including decking profiles, concrete plinth, steel frame for mezzanine, sandwich panels with accessories and canopy. We will start work on October 1, 2021.

• Client: Asplunds Bygg
• Location: Skövde
• Size: – m2
• Start: 2021-10-01

New website launched

As a modern contractor, it was obvious to update the website and the entire identity for the future. We want to live as we learn.

Here, you will find our latest references and can also download our environmental, work environment and quality policies. Due to several requests outside Sweden, we have also made the website available in English.

Feel free to follow us on our social media: Facebook and Linkedin

New installation job in Örebro

Coverto are pleased to have signed a contract with Logistic Contractor to install 7 000 m2 of sandwichpanels as well as flashings, gutters, downpipes and steel staircases for EBREX facility in Örebro with start on October 1st 2018.

  • Client: Logistic Contractor
  • Location: Örebro
  • Area:7 000 m2
  • Start: 2018-10-01